Failed lots/rework procedure.

Checkout our iOS App for a better way to browser and research.

§ 983.52 Failed lots/rework procedure.

(a) Substandard pistachios. Each lot of substandard pistachios may be reworked to meet aflatoxin or quality requirements. The committee may establish, with the Secretary's approval, appropriate rework procedures.

(b) Failed lot reporting. If a lot fails to meet the aflatoxin and/or the quality requirements of this part, a failed lot notification report shall be completed and sent to the committee within 10 working days of the test failure. This form must be completed and submitted to the committee each time a lot fails either aflatoxin or quality testing. The accredited laboratories shall send the failed lot notification reports for aflatoxin tests to the committee, and the handler, under the supervision of an inspector, shall send the failed lot notification reports for the lots that do not meet the quality requirements to the committee.

[74 FR 56542, Nov. 2, 2009]


Download our app to see the most-to-date content.