Responsibility for operation and maintenance.

Checkout our iOS App for a better way to browser and research.

§ 654.30 Responsibility for operation and maintenance.

The land user is responsible for O&M of soil and water conservation measures installed with NRCS assistance provided through soil, water, and other conservation districts.


Download our app to see the most-to-date content.