Other requirements.

Checkout our iOS App for a better way to browser and research.

§ 1784.22 Other requirements.

Other Federal statutes and regulations are applicable to grants awarded under this part. These include but are not limited to:

(a) 7 CFR part 1, subpart A - USDA implementation of Freedom of Information Act.

(b) 7 CFR part 3 - USDA implementation of OMB Circular No. A-129 regarding debt collection.

(c) 7 CFR part 15, subpart A - USDA implementation of Title VI of the Civil Rights Act of 1964, as amended.

(e) 7 CFR part 1901, subpart E - Civil Rights Compliance Requirements.

(f) 2 CFR part 200 - Uniform Guidance.

(g) 2 CFR part 215 - General Program Administrative Requirements.

(h) 2 CFR part 418 - New Restrictions on Lobbying, prohibiting the use of appropriated funds to influence Congress or a Federal agency in connection with the making of any Federal grant and other Federal contracting and financial transactions.

(i) 2 CFR parts 400 and 415 - USDA implementation of Uniform Administrative Requirements for Grants and Agreements with Institutions of Higher Education, Hospitals, and Other Nonprofit Organizations.

(j) 2 CFR part 180, as adopted by USDA through 2 CFR 417, Government-wide Debarment and Suspension (Non-procurement); 2 CFR part 182, as adopted by USDA through 2 CFR 421, Government-wide Requirements for Drug-Free Workplace (Federal Assistance), implementing Executive Order 12549 on debarment and suspension and the Drug-Free Workplace Act of 1988 (41 U.S.C. 701).

(k) 2 CFR part 200, subpart F - USDA implementation of audit requirements for non-federal organizations.

(l) 29 U.S.C. 794, section 504 - Rehabilitation Act of 1973, and 7 CFR part 15B (USDA implementation of statute), prohibiting discrimination based upon physical or mental handicap in federally assisted programs.

(m) Floodplains. The agencies follow the eight-step decision-making process referenced in Section 2(a) of Executive Order 11988, Floodplain Management, when undertaking actions located in floodplains. Pursuant to E. O. 11988, the IHS uses a Class Review process to exclude certain actions from further review under the eight-step process. For all actions that do not qualify for IHS Class Review, the eight-step process shall be completed. All practicable measures to minimize development in floodplains and reduce the risk to human safety, health, and welfare shall be followed, including elevating a new water or wastewater facility at least one foot above the base flood elevation as determined by the Army Corp of Engineers, other qualified survey, or best available data. Since they are considered “critical facilities” as defined by the Federal Emergency Management Agency (FEMA), water and wastewater facilities may be subject to more stringent standards such as relocation out of the floodplain, higher elevation, or other flood proofing measures. If an area has been designated a floodplain by FEMA Flood Insurance Rate Map (FIRM) coverage, flood insurance shall be required for facilities located in flood plains. If an area has no FEMA FIRM coverage the requirement to obtain flood insurance does not apply. If a community is located within a mapped FEMA Flood Insurance Rate Map (FIRM) 100-year floodplain, but is not a participating National Flood Insurance Program (NFIP) community member, then RUS may not fund the project according to 7 CFR 1806 Subpart B.

(n) Project planning, including engineering reports and environmental review documentation, to the maximum extent feasible, must address all water or waste disposal needs for a community in a coordinated manner with other community development projects and take into consideration information presented in available community strategic and comprehensive plans. Any reports or designs completed with funds must be consistent with sound engineering practices and USDA regulations, including 7 CFR part 1970.

[80 FR 52609, Sept. 1, 2015, as amended at 81 FR 11029, Mar. 2, 2016]


Download our app to see the most-to-date content.