PocketLaw
Home
Catalog
Law Online
Teams
Our Free Mobile App
Positive Train Control Systems
Law
CFR 49
Transportation
Other Regulations Relating to Transportation
Federal Railroad Administration, Department of Transportation
Rules, Standards, and Instructions Governing the Installation, Inspection, Maintenance, and Repair of Signal and Train Control Systems, Devices, and Appliances
Positive Train Control Systems
Checkout our iOS App for a better way to browser and research.
Section
236.1001
Purpose and scope.
Section
236.1003
Definitions.
Section
236.1005
Requirements for Positive Train Control systems.
Section
236.1006
Equipping locomotives operating in PTC territory.
Section
236.1007
Additional requirements for high-speed service.
Section
236.1009
Procedural requirements.
Section
236.1011
PTC Implementation Plan content requirements.
Section
236.1013
PTC Development Plan and Notice of Product Intent content requirements and Type Approval.
Section
236.1015
PTC Safety Plan content requirements and PTC System Certification.
Section
236.1017
Independent third party Verification and Validation.
Section
236.1019
Main line track exceptions.
Section
236.1020
§ 236.1020 [Reserved]
Section
236.1021
Discontinuances, material modifications, and amendments.
Section
236.1023
Errors and malfunctions.
Section
236.1025
§ 236.1025 [Reserved]
Section
236.1027
PTC system exclusions.
Section
236.1029
PTC system use and failures.
Section
236.1031
Previously approved PTC systems.
Section
236.1033
Communications and security requirements.
Section
236.1035
Field testing requirements.
Section
236.1037
Records retention.
Section
236.1039
Operations and Maintenance Manual.
Section
236.1041
Training and qualification program, general.
Section
236.1043
Task analysis and basic requirements.
Section
236.1045
Training specific to office control personnel.
Section
236.1047
Training specific to locomotive engineers and other operating personnel.
Section
236.1049
Training specific to roadway workers.