Limitations.

Checkout our iOS App for a better way to browser and research.

316.603-3 Limitations.

An official one level above the contracting officer shall make the written determination, to be included in the contract file, that no other contract type is suitable and to approve all letter contract modifications. No letter contract or modification can exceed the limits prescribed in FAR 16.603-2(c).


Download our app to see the most-to-date content.