Continuation of current contracts.

Checkout our iOS App for a better way to browser and research.

2009.405-1 Continuation of current contracts.

The Head of the Contracting Activity is authorized to make the determination to continue contracts or subcontracts in existence at the time the contractor was debarred, suspended, or proposed for debarment in accordance with FAR 9.405-1.


Download our app to see the most-to-date content.