Final reports.

Checkout our iOS App for a better way to browser and research.

1552.211-77 Final reports.

As prescribed in 1511.011-77, insert this contract clause when a contract requires both a draft and a final report.

Final Reports (SEP 2013)

(a) “Draft Report” The Contractor shall submit a copy of the draft final report on or before (date) to the Contracting Officer's Representative and Contracting Officer in electronic format, unless specified otherwise by the Government. The draft shall be double-spaced or space-and-a-half and shall include all pertinent material required in the final report. The Government will review for approval or disapproval the draft and provide a response to the Contractor within __ calendar days after receipt. If the Government does not provide a response within the allotted review time, the Contractor immediately shall notify the Contracting Officer in writing.

(b) “Final Report” - The Contractor shall deliver a final report on or before the last day of the period of performance specified in the contract. Distribution is as follows:

Expand Table
No. of copies Addressee Address (email and/or shipping)
1 EPA Library
1 Contracting Officer
1 Contracting Officer's Representative

(c) The electronic format of the draft and final report shall be in accordance with the current EPA policy and procedures.

(End of clause)

[78 FR 46291, July 31, 2013, as amended at 80 FR 29986, May 26, 2015]


Download our app to see the most-to-date content.