PocketLaw
Home
Catalog
Law Online
Teams
Our Free Mobile App
General Requirements
Law
CFR 46
Shipping
Coast Guard, Department of Homeland Security
Marine Engineering
Power Boilers
General Requirements
Checkout our iOS App for a better way to browser and research.
Section
52.01-1
Incorporation by reference.
Section
52.01-2
Adoption of section I of the ASME Boiler and Pressure Vessel Code.
Section
52.01-3
Definitions of terms used in this part.
Section
52.01-5
Plans.
Section
52.01-10
Automatic controls.
Section
52.01-35
Auxiliary, donkey, fired thermal fluid heater, and heating boilers.
Section
52.01-40
Materials and workmanship.
Section
52.01-50
Fusible plugs (modifies A-19 through A-21).
Section
52.01-55
Increase in maximum allowable working pressure.
Section
52.01-90
Materials (modifies PG-5 through PG-13).
Section
52.01-95
Design (modifies PG-16 through PG-31 and PG-100).
Section
52.01-100
Openings and compensation (modifies PG-32 through PG-39, PG-42 through PG-55).
Section
52.01-105
Piping, valves and fittings (modifies PG-58 and PG-59).
Section
52.01-110
Water-level indicators, water columns, gauge-glass connections, gauge cocks, and pressure gauges (modifies PG-60).
Section
52.01-115
Feedwater supply (modifies PG-61).
Section
52.01-120
Safety valves and safety relief valves (modifies PG-67 through PG-73).
Section
52.01-130
Installation.
Section
52.01-135
Inspection and tests (modifies PG-90 through PG-100).
Section
52.01-140
Certification by stamping (modifies PG-104 through PG-113).
Section
52.01-145
Manufacturers' data report forms (modifies PG-112 and PG-113).