Positive pressure - T/ALL.

Checkout our iOS App for a better way to browser and research.

§ 32.53-30 Positive pressure - T/ALL.

Each inert gas system must be designed to enable the operator to maintain a gas pressure of 100 millimeters (4 inches) of water on filled cargo tanks and during loading and unloading of cargo tanks.

[USCG-2003-16630, 73 FR 65160, Oct. 31, 2008]


Download our app to see the most-to-date content.