Lands for reservoir construction and operation.

Checkout our iOS App for a better way to browser and research.

§ 8.1 Lands for reservoir construction and operation.

The fee title will be acquired to the following:

(a) Lands necessary for permanent structures.

(b) Lands below the maximum flowage line of the reservoir including lands below a selected freeboard where necessary to safeguard against the effects of saturation, wave action, and bank erosion and the permit induced surcharge operation.

(c) Lands needed to provide for public access to the maximum flowage line as described in paragraph (b) of this section, or for operation and maintenance of the project.


Download our app to see the most-to-date content.