(a) Purpose and scope. This section sets forth the applicable State implementation plan for Florida under section 110 of the Clean Air Act, 42 U.S.C. 7401, and 40 CFR part 51 to meet national ambient air quality standards.

(b) Incorporation by reference.

(1) Material listed in paragraphs (c) and (d) of this section with an EPA approval date prior to October 1, 2017, was approved for incorporation by reference by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Material is incorporated as it exists on the date of the approval, and notice of any change in the material will be published in the Federal Register. Entries in paragraphs (c) and (d) of this section with EPA approval dates after October 1, 2017, for Florida will be incorporated by reference in the next update to the SIP compilation.

(2) EPA Region 4 certifies that the rules/regulations provided by EPA in the SIP compilation at the addresses in paragraph (b)(3) of this section are an exact duplicate of the officially promulgated State rules/regulations which have been approved as part of the State Implementation Plan as of the dates referenced in paragraph (b)(1) of this section.

(3) Copies of the materials incorporated by reference may be inspected at the Region 4 EPA Office at 61 Forsyth Street SW, Atlanta, GA 30303. To obtain the material, please call (404) 562-9022. You may inspect the material with an EPA approval date prior to October 1, 2017, for Florida at the National Archives and Records Administration. For information on the availability of this material at NARA go to: http://www.archives.gov/federal-register/cfr/ibr-locations.html.

(c) EPA Approved Florida Regulations.

Expand Table

EPA Approved Florida Regulations

State
citation
(section)
Title/subject State
effective
date
EPA approval date Explanation
Chapter 62-204 Air Pollution Control - General Provisions
62-204.100 Purpose and Scope 3/13/1996 6/16/1999, 64 FR 32353
62-204.200 Definitions 2/12/2006 6/27/2008, 73 FR 36435
62-204.220 Ambient Air Quality Protection 3/13/1996 6/16/1999, 64 FR 32346
62-204.240 Ambient Air Quality Standards 3/13/1996 6/16/1999, 64 FR 32346
62-204.260 Prevention of Significant Deterioration Maximum Allowable Increases (PSD Increments) 2/12/2006 6/27/2008, 73 FR 36435
62-204.320 Procedures for Designation and Redesignation of Areas 3/13/1996 6/16/1999, 64 FR 32346
62-204.340 Designation of Attainment, Nonattainment, and Maintenance Areas 3/13/1996 6/16/1999, 64 FR 32346
62-204.360 Designation of Prevention of Significant Deterioration Areas 3/13/1996 6/16/1999, 64 FR 32346
62-204.400 Public Notice and Hearing Requirements for State Implementation Plan Revisions 11/30/1994 6/16/1999, 64 FR 32353
62-204.500 Conformity 8/31/1998 8/11/2003, 68 FR 47468 Except for the incorporation by reference of 40 CFR 93.104(e) of the Transportation Conformity Rule.
Chapter 62-210 Stationary Sources - General Requirements
62-210.200 Definitions 10/23/2013 9/16/2020, 85 FR 57707 The ethanol production facility exclusion within the definition of “major stationary source” at 62-210.200 does not apply to 62-212.500.
Except the following definitions: “animal crematory”; “biological waste”; “biological waste incinerator”; “biomedical waste”; “capture efficiency”; “cast polymer operation”; “human crematory”; “major source of air pollution,” “major source,” or “title V source”; “printed interior panels”; “unit-specific applicable requirement”; and “waste-to-energy facility”.
62-210.220 Small Business Assistance Program 10/6/08 7/3/2017, 82 FR 30767
62-210.300 Permits Required 5/9/2007 6/1/2009, 63 FR 26103
62-210.310 Air General Permits 6/29/2011 10/6/2017, 82 FR 46682
62-210.350 Public Notice and Comment 10/12/2008 7/29/2020, 85 FR 45539 Except for 62-210.350(1)(c) which was withdrawn from EPA consideration on June 28, 2017.
62-210.360 Administrative Permit Corrections 11/23/1994 6/16/1999, 64 FR 32346
62-210.370 Emissions Computation and Reporting 2/2/2006 6/27/2008, 73 FR 36435
62-210.550 Stack Height Policy 11/23/1994 6/16/1999, 64 FR 32346
62-210.650 Circumvention 10/15/1992 10/20/1994, 59 FR 52916
62-210.700 Excess Emissions 11/23/1994 6/16/1999, 64 FR 32346
62-210.900 Forms and Instructions 2/9/1993 11/7/1994, 59 FR 46157
Chapter 62-212 Stationary Sources - Preconstruction Review
62-212.300 General Preconstruction Review Requirements 6/29/2009 4/12/2011, 76 FR 20239
62-212.400 Prevention of Significant Deterioration 3/28/2012 9/16/2020, 85 FR 57707 Except the provisions for the PM2.5 significant impact levels at (5)(b).
62-212.500 Preconstruction Review for Nonattainment Areas 2/2/2006 6/27/2008, 73 FR 36435 The ethanol production facility exclusion within the definition of “major stationary source” at 62-210.200 does not apply to 62-212.500.
62-212.720 Actuals Plantwide Applicability Limits (PALs) 12/17/2013 7/3/2017, 82 FR 30767
Chapter 62-252 Gasoline Vapor Control
62-252.300 Gasoline Dispensing Facilities Stage I Vapor Recovery 5/1/2015 8/12/2015, 80 FR 48259
Chapter 62-256 Open Burning and Frost Protection Fires
62-256.100 Declaration and Intent 12/09/1975 11/1/1977, 42 FR 57124
62-256.200 Definitions 11/30/1994 6/16/1999, 64 FR 32346
62-256.300 Prohibitions 11/30/1994 6/16/1999, 64 FR 32346
62-256.400 Agricultural and Silvicultural Fires 7/1/1971 5/31/1972, 37 FR 10842
62-256.450 Burning for Cold or Frost Protection 6/27/1991 9/9/1994, 59 FR 46552
62-256.500 Land Clearing 11/30/1994 6/16/1999, 64 FR 32346
62-256.600 Industrial, Commercial, Municipal, and Research Open Burning 7/1/1971 5/31/1972, 37 FR 10842
62-256.700 Open Burning Allowed 11/30/1994 6/16/1999, 64 FR 32346
62-256.800 Effective Date 7/1/1971 5/31/1972, 37 FR 10842
Chapter 62-296 Stationary Sources - Emission Standards
62-296.100 Purpose and Scope 10/6/2008 10/6/2017, 82 FR 46682
62-296.320 General Pollutant Emission Limiting Standards 3/13/1996 6/16/1999, 64 FR 32346
62-296.340 Best Available Retrofit Technology 1/31/2007 8/29/2013, 78 FR 53250
62-296.401 Incinerators 3/13/1996 6/16/1999, 64 FR 32346
62-296.402 Sulfuric Acid Plants 3/13/1996 6/16/1999, 64 FR 32346
62-296.403 Phosphate Processing 3/13/1996 6/16/1999, 64 FR 32346
62-296.404 Kraft (Sulfate) Pulp Mills and Tall Oil Plants 3/13/1996 6/16/1999, 64 FR 32346
62-296.405 Fossil Fuel Steam Generators with more than 250 million Btu per Hour Heat Input 3/2/1999 10/6/2017, 82 FR 46682
62-296.406 Fossil Fuel Steam Generator with less than 250 million Btu per Hour Heat Input, New and Existing Emissions Units 3/2/1999 10/6/2017, 82 FR 46682
62-296.408 Nitric Acid Plants 11/23/1994 6/16/1999, 64 FR 32346
62-296.409 Sulfur Recovery Plants 11/23/1994 6/16/1999, 64 FR 32346
62-296.410 Carbonaceous Fuel Burning Equipment 11/23/1994 6/16/1999, 64 FR 32346
62-296.412 Dry Cleaning Facilities 3/11/2010 10/6/2017, 82 FR 46682
62-296.414 Concrete Batching Plants 1/10/2007 10/6/2017, 82 FR 46682
62-296.415 Soil Thermal Treatment Facilities 3/13/1996 6/16/1999, 64 FR 32346
62-296.418 Bulk Gasoline Plants 3/11/2010 10/6/2017, 82 FR 46682
62-296.470 Implementation of Federal Clean Air Interstate Rule 4/1/2007 10/12/07, 72 FR 58016
62-296.500 Reasonably Available Control Technology (RACT) - Volatile Organic Compounds (VOC) and Nitrogen Oxides (NOX) Emitting Facilities 3/11/2010 10/6/2017, 82 FR 46682
62-296.501 Can Coating 11/23/1994 6/16/1999, 64 FR 32346
62-296.502 Coil Coating 11/23/1994 6/16/1999, 64 FR 32346
62-296.503 Paper Coating 11/23/1994 6/16/1999, 64 FR 32346
62-296.504 Fabric and Vinyl Coating 11/23/1994 6/16/1999, 64 FR 32346
62-296.505 Metal Furniture Coating 11/23/1994 6/16/1999, 64 FR 32346
62-296.506 Surface Coating of Large Appliances 11/23/1994 6/16/1999, 64 FR 32346
62-296.507 Magnet Wire Coating 11/23/1994 6/16/1999, 64 FR 32346
62-296.508 Petroleum Liquid Storage 10/6/2008 10/6/2017, 82 FR 46682 Amendments effective 10/6/08.
62-296.510 Bulk Gasoline Terminals 11/23/1994 6/16/1999, 64 FR 32346
62-296.511 Solvent Metal Cleaning 6/5/1996 01/16/2003, 68 FR 2204
62-296.512 Cutback Asphalt 11/23/1994 6/16/1999, 64 FR 32346
62-296.513 Surface Coating of Miscellaneous Metal Parts and Products 11/23/1994 6/16/1999, 64 FR 32346
62-296.514 Surface Coating of Flat Wood Paneling 11/23/1994 6/16/1999, 64 FR 32346
62-296.515 Graphic Arts Systems 11/23/1994 6/16/1999, 64 FR 32346
62-296.516 Petroleum Liquid Storage Tanks with External Floating Roofs 11/23/1994 6/16/1999, 64 FR 32346
62-296.570 Reasonably Available Control Technology (RACT) - Requirements for Major VOC and NOX - Emitting Facilities 11/23/1994 6/16/1999, 64 FR 32346
62-296.600 Reasonably Available Control Technology (RACT) - Lead 3/13/1996 6/16/1999, 64 FR 32346
62-296.601 Lead Processing Operations in General 8/8/1994 9/18/1996, 61 FR 49064
62-296.602 Primary Lead Acid Battery Manufacturing Operations 3/13/1996 9/18/1996, 61 FR 49064
62-296.603 Secondary Lead Smelting Operations 8/8/1994 9/18/1996, 61 FR 49064
62-296.604 Electric Arc Furnace Equipped Secondary Steel Manufacturing Operations 8/8/1994 9/18/1996, 61 FR 49064
62-296.605 Lead Oxide Handling Operations 8/8/1994 9/18/1996, 61 FR 49064
62-296.700 Reasonably Available Control Technology (RACT) - Particulate Matter 11/23/1994 6/16/1999, 64 FR 32346
62-296.701 Portland Cement Plants 11/23/1994 6/16/1999, 64 FR 32346
62-296.702 Fossil Fuel Steam Generators 11/23/1994 6/16/1999, 64 FR 32346
62-296.703 Carbonaceous Fuel Burners 11/23/1994 6/16/1999, 64 FR 32346
62-296.704 Asphalt Concrete Plants 11/23/1994 6/16/1999, 64 FR 32346
62-296.705 Phosphate Processing operations 11/23/1994 6/16/1999, 64 FR 32346
62-296.706 Glass Manufacturing Process 11/23/1994 6/16/1999, 64 FR 32346
62-296.707 Electric Arc Furnaces 11/23/1994 6/16/1999, 64 FR 32346
62-296.708 Sweat of Pot Furnaces 11/23/1994 6/16/1999, 64 FR 32346
62-296.709 Lime Kilns 11/23/1994 6/16/1999, 64 FR 32346
62-296.710 Smelt Dissolving Tanks 11/23/1994 6/16/1999, 64 FR 32346
62-296.711 Materials Handling, Sizing, Screening, Crushing and Grinding operations 11/23/1994 6/16/1999, 64 FR 32346
62-296.712 Miscellaneous Manufacturing Process Operations 11/23/1994 6/16/1999, 64 FR 32346
Chapter 62-297 Stationary Sources - Emissions Monitoring
62-297.310 General Emissions Test Requirements 3/9/2015 10/6/2017, 82 FR 46682
62-297.440 Supplementary Test Procedures 7/10/2014 4/2/2018, 83 FR 13875
62-297.450 EPA VOC Capture Efficiency Test Procedures 7/10/2014 4/2/2018, 83 FR 13875
62-297.620 Exceptions and Approval of Alternate Procedures and Requirements 11/23/1994 6/16/1999, 64 FR 32346
State Statutes
112.3143(4) Voting Conflict 4/19/2012 7/30/2012, 77 FR 44485 To satisfy the requirements of sections 128 and 110(a)(2)(E)(ii).
112.3144 Full and Public Disclosure of Financial Interests 4/19/2012 7/30/2012, 77 FR 44485 To satisfy the requirements of sections 128 and 110(a)(2)(E)(ii).
403.131 Injunctive relief, remedies 4/19/2012 7/30/2012, 77 FR 44485 To satisfy the requirements of section 110(a)(2)(G).
120.569 Decisions which affect substantial interests 4/19/2012 7/30/2012, 77 FR 44485 To satisfy the requirements of section 110(a)(2)(G).

(d) EPA-approved State Source-specific requirements.

Expand Table

EPA-Approved Florida Source-Specific Requirements

Name of source Permit No. State
effective
date
EPA approval date Explanation
Harry S Truman, animal import center NA 11/26/1996 1/19/2000, 65 FR 2882
Martin Gas Sales, Inc 0570477-007-AC 1/17/2003 5/1/2003, 68 FR 23209
Broward County Aviation Department 8/15/2003 6/17/2003, 69 FR 33862 Order Granting Variance from Rule 62-252.400.
Lockheed Martin Aeronautics Company 4/16/2005 11/28/2006, 71 FR 68745 Requirement that Lockheed Martin Aeronautics Company comply with EPA's Aerospace CTG at its Pinellas County facility.
Combs Oil Company 7/31/2009 9/25/2015, 80 FR 57727 Order Granting Variance from Rule 62-296.418(2)(b)2.
Mosaic Fertilizer, LLC Air Permit No. 0570008-080-AC 1/15/2015 7/3/2017, 82 FR 30749 Specific Conditions pertaining to: EU004; EU005; and EU006.
Rayonier Performance Fibers, LLC Air Permit No. 0890004-036-AC 4/12/2012 7/3/2017, 82 FR 30749 Specific Conditions pertaining to: EU005; EU006; and EU022.
Tampa Electric Company - Big Bend Station Air Permit No. 0570039-074-AC 2/26/2015 7/3/2017, 82 FR 30749 Only Section 3, Subsection B, Condition 5.
WestRock, LLC Air Permit No. 0890003-046-AC 1/9/2015 7/3/2017, 82 FR 30749 Specific Conditions pertaining to: EU006; EU015; EU007 and EU011.
Tampa Electric Company-Big Bend Station Air Permit No. 0570039-120-AC 12/14/2018 11/12/2019, 84 FR 60927 Only Section 2, Condition 4; the “SO2 Emissions Cap” provision from Section 3, Condition 4; the “SO2 CEMS” provision from Section 3, Condition 4; and the “Methods of Operation” for Units 1 and 2 provision from Section 3, Condition 6.
Mosaic Fertilizer, LLC - Bartow Facility Air Permit No. 1050046-050-AC 7/3/2017 2/20/2020, 85 FR 9666 Section III, Subsection A, Specific Condition 3 (as administratively corrected by Permit No. 1050046-063-AC with an effective date of January 11, 2019); Condition 4; and Condition 5.
Mosaic Fertilizer, LLC - New Wales Facility Air Permit No. 1050059-106-AC 10/30/2017 2/20/2020, 85 FR 9666 Section III, Subsection A, Specific Condition 3 (as administratively corrected by Permit No. 1050059-114-AC with an effective date of January 11, 2019); Condition 4; and Condition 5.
EnviroFocus Technologies, LLC Air Construction Permit No. 0570057-27-AC 12/14/2012 6/4/2021, 86 FR 29949 Except for conditions not specifically related to lead emissions; Section 3, Subsection B, Specific Conditions 3 and 10; Section 3, Subsection C, Specific Condition 5; and Section 3, Subsection G, Specific Condition 5.
EnviroFocus Technologies, LLC Air Construction Permit No. 0570057-37-AC 11/6/2019 6/14/2021, 86 FR 29949 Only incorporating the following conditions: Section 3, Subsection B, Specific Conditions 2 and 3a; Section 3, Subsection C, Specific Condition 1; and Section 3, Subsection D, Specific Condition 1.

(e) EPA-approved Florida non-regulatory provisions.

Expand Table

EPA-Approved Florida Non-Regulatory Provisions

Provision State
effective
date
EPA
approval
date
Federal
Register, notice
Explanation
Revision to Maintenance Plan for Southeast Florida Area 12/20/2002 2/13/2004 69 FR 7132 10 year update.
Revision to Maintenance Plan for the Tampa, Florida Area 12/20/2002 3/29/2004 69 FR 16172 10 year update.
Revision to Maintenance Plan Update for Jacksonville Area, Florida 12/20/2002 7/22/2003 68 FR 43315
110(a)(1) Maintenance Plan for the Southeast Florida Area 7/2/2009 7/26/2010 75 FR 29671 110(a)(1) maintenance plan for 1997 8-hour ozone NAAQS.
110(a)(1) Maintenance Plan for the Tampa, Florida Area 7/2/2009 7/26/2010 75 FR 29671 110(a)(1) maintenance plan for 1997 8-hour ozone NAAQS.
110(a)(1) Maintenance Plan for the Jacksonville, Florida Area 7/2/2009 7/26/2010 75 FR 29671 110(a)(1) maintenance plan for 1997 8-hour ozone NAAQS.
110(a)(1) and (2) Infrastructure Requirements for the 1997 8-Hour Ozone National Ambient Air Quality Standards 12/13/2007 7/30/2012 77 FR 44485
Section 128 Requirements 5/24/2012 7/30/2012 77 FR 44485
Sections 110(a)(2)(E)(ii) and (G) Infrastructure Requirements for the 1997 8-Hour Ozone National Ambient Air Quality Standards 5/24/2012 7/30/2012 77 FR 44485
110(a)(2)(D)(i)(I) Infrastructure Requirements for the 2006 24-hour PM2.5 NAAQS 9/23/2009 10/11/2012 77 FR 61724 EPA partially disapproved this SIP submission to the extent that it relied on the Clean Air Interstate Rule to meet the 110(a)(2)(D)(i)(I) requirements for the 2006 24-hour PM2.5 NAAQS.
110(a)(1) and (2) Infrastructure Requirements for 1997 Fine Particulate Matter National Ambient Air Quality Standards 4/18/2008 11/8/2012 77 FR 66927 With the exception of section 110(a)(2)(D)(i).
110(a)(1) and (2) Infrastructure Requirements for 2006 Fine Particulate Matter National Ambient Air Quality Standards 9/23/2009 11/8/2012 77 FR 66927 With the exception of section 110(a)(2)(D)(i).
Portion of Regional Haze Plan Amendment submitted on September 17, 2012 9/17/2012 11/29/2012 77 FR 71111 Only the BART determinations approved in 77 FR 71111 are incorporated.
110(a)(1) and (2) Infrastructure Requirements for 1997 Fine Particulate Matter National Ambient Air Quality Standards 4/18/2008 4/3/2013 78 FR 19998 EPA disapproved the State's prong 3 of section 110(a)(2)(D)(i) as it relates to GHG PSD permitting requirements.
110(a)(1) and (2) Infrastructure Requirements for 2006 Fine Particulate Matter National Ambient Air Quality Standards 9/23/2009 4/3/2013 78 FR 19998 EPA disapproved the State's prong 3 of section 110(a)(2)(D)(i) as it relates to GHG PSD permitting requirements.
Initial Regional Haze Plan 3/19/2010 8/29/2013 78 FR 53250
Regional Haze Plan Amendment 1 8/31/2010 8/29/2013 78 FR 53250
Regional Haze Plan Amendment 2 9/17/2012 8/29/2013 78 FR 53250 Remaining Portion of Regional Haze Plan Amendment not approved on November 29, 2012.
Progress Energy Permit (Air Permit No. 0170004-038-AC) 10/15/2012 8/29/2013 78 FR 53250
Update to October 15, 2013, Progress Energy Permit (Air Permit No. 0170004-038-AC) 5/2/2013 8/29/2013 78 FR 53250
110(a)(1) and (2) Infrastructure Requirements for the 2008 8-Hour Ozone National Ambient Air Quality Standards 10/31/2011 11/1/2013 78 FR 65559 With the exception of section 110(a)(2)(D)(i)(I) concerning interstate transport; section 110(a)(2)(D)(i)(II) concerning visibility requirements; and the portions of sections 110(a)(2)(C), prong 3 of 110(a)(2)(D)(i), and 110(a)(2)(J) related to the regulation of GHG emissions, which are being disapproved.
RVP Update for Florida 1997 8-hour Ozone Maintenance Plans 8/15/2013 1/6/2014 79 FR 573
110(a)(1) and (2) Infrastructure Requirements for the 1997 Fine Particulate Matter National Ambient Air Quality Standards 4/18/2008 8/25/2014 79 FR 50554 Addressing prong 4 of section 110(a)(2)(D)(i) only.
110(a)(1) and (2) Infrastructure Requirements for the 2006 Fine Particulate Matter National Ambient Air Quality Standards 9/23/2009 8/25/2014 79 FR 50554 Addressing prong 4 of section 110(a)(2)(D)(i) only.
110(a)(1) and (2) Infrastructure Requirements for the 2008 Ozone National Ambient Air Quality Standards 10/31/2011 8/25/2014 79 FR 50554 Addressing prong 4 of section 110(a)(2)(D)(i) only.
110(a)(1) and (2) Infrastructure Requirements for the 2008 Lead NAAQS 10/14/2011 3/18/2015 80 FR 14019 Addressing the PSD permitting requirements of sections 110(a)(2)(C), 110(a)(2)(D)(i)(II) (prong 3) and 110(a)(2)(J) only.
110(a)(1) and (2) Infrastructure Requirements for the 2010 NO2 NAAQS 1/22/2013 3/18/2015 80 FR 14019 Addressing the PSD permitting requirements of sections 110(a)(2)(C), 110(a)(2)(D)(i)(II) (prong 3) and 110(a)(2)(J) only.
2008 Lead Attainment Demonstration for Hillsborough Area 6/29/2012 4/16/2015 80 FR 20441
2008 Lead Attainment Demonstration for Hillsborough Area Amendment 6/27/2013 4/16/2015 80 FR 20441
110(a)(1) and (2) Infrastructure Requirements for the 2008 Lead National Ambient Air Quality Standards 10/14/2011 9/24/2015 80 FR 57538 With the exception of provisions pertaining to PSD permitting requirements in sections 110(a)(2)(C), prong 3 of D(i) and (J).
Regional Haze Plan Amendment 3 4/30/2014 10/23/2015 80 FR 64344 Establishes NOX BART emissions limit for Unit 1 at the Lakeland Electric - C.D. McIntosh Power Plant and includes FDEP Permit No. 1050004-034-AC.
March 2015 Regional Haze Progress Report 3/10/2015 8/2/2016 81 FR 50628
110(a)(1) and (2) Infrastructure Requirements for the 2010 1-hour Primary SO2 National Ambient Air Quality Standards 6/3/2013 9/30/2016 81 FR 67179 With the exception of section for provisions relating to 110(a)(2)(D)(i)(I) (prongs 1 and 2) concerning interstate transport requirements.
110(a)(1) and (2) Infrastructure Requirements for the 2010 1-hour NO2 NAAQS 1/22/2013 11/23/2016 81 FR 84479 With the exception of sections: 110(a)(2)(B) Concerning ambient air quality monitoring and data system; 110(a)(2)(C) and (J) concerning PSD permitting requirements; and 110(a)(2)(D)(i)(I) and (II) (prongs 1 through 3) concerning interstate transport requirements.
110(a)(1) and (2) Infrastructure Requirements for the 2012 Annual PM2.5 NAAQS 10/15/2015 4/7/2017 82 FR 16920 With the exception of section 110(a)(2)(D)(i)(I) and (II) (prongs 1 and 2).
2010 1-hour SO2 Attainment Demonstration for the Hillsborough Area 4/3/2015 7/3/2017 82 FR 30749
2010 1-hour SO2 Attainment Demonstration for the Nassau Area 4/3/2015 7/3/2017 82 FR 30749
110(a)(1) and (2) Infrastructure Requirements for the 2010 1-hour NO2 NAAQS (Element B only) 1/22/2013 8/10/2017 82 FR 37310 Addressing section 110(a)(2)(B) concerning ambient air quality monitoring and data system only.
110(a)(1) and (2) Infrastructure Requirements for the 2010 1-hour NO2 NAAQS 2/3/2017 10/16/2017 82 FR 47983 Addressing Prongs 1 and 2 of section 110(a)(2)(D)(i) only.
2008 Lead NAAQS Maintenance Plan for the Hillsborough Area 3/26/2018 9/11/2018 83 FR 45836
110(a)(1) and (2) Infrastructure Requirements for the 2012 Annual PM2.5 NAAQS 10/15/2015 9/25/2018 83 FR 48387 Addressing Prongs 1 and 2 of section 110(a)(2)(D)(i)(I) only.
110(a)(1) and (2) Infrastructure Requirements for the 2008 8-Hour Ozone NAAQS 10/3/2017 4/11/2019 84 FR 14615 Addressing prongs 1 and 2 of section 110(a)(2)(D)(i)(I) only.
2010 1-hour SO2 Maintenance Plan for the Nassau Area 6/7/2018 4/24/2019 84 FR 17085
2010 1-hour SO2 Maintenance Plan for the Hillsborough Area 6/7/2018 11/12/2019 84 FR 60927
2010 1-hour SO2 Maintenance Plan for the Hillsborough-Polk Area 10/9/2019 2/20/2020 85 FR 9666
110(a)(1) and (2) Infrastructure Requirements for the 2015 8-Hour Ozone NAAQS 9/18/2018 4/6/2020 85 FR 19089 With the exception of Prongs 1 and 2 of section 110(a)(2)(D)(i)(I).
110(a)(1) and (2) Infrastructure Requirements for the 2010 1-hour SO2 NAAQS 9/18/2018 5/1/2020 85 FR 25295 Addressing Prongs 1 and 2 of section 110(a)(2)(D)(i) only.
2008 Lead NAAQS Maintenance Plan for the Hillsborough Area 1/23/2020 6/4/2021 86 FR 29949 Updates to the attainment emissions inventory and the maintenance demonstration, including the projected future emissions inventories, in the March 26, 2018 maintenance plan.
110(a)(1) and (2) Infrastructure Requirements for the 1997 8-Hour Ozone National Ambient Air Quality Standards 8/26/2020 7/7/2021 86 FR 35608 Approving SIP submission for sections 110(a)(2)(C) & 110(a)(2)(J) as it relates to GHG PSD permitting requirements.
110(a)(1) and (2) Infrastructure Requirements for the 1997 Annual Fine Particulate Matter National Ambient Air Quality Standards 8/26/2020 7/7/2021 86 FR 35608 Approving SIP submission for prong 3 of section 110(a)(2)(D)(i) as it relates to GHG PSD permitting requirements.
110(a)(1) and (2) Infrastructure Requirements for the 2006 24-hour Fine Particulate Matter National Ambient Air Quality Standards 8/26/2020 7/7/2021 86 FR 35608 Approving SIP submission for prong 3 of section 110(a)(2)(D)(i) as it relates to GHG PSD permitting requirements.
110(a)(1) and (2) Infrastructure Requirements for the 2008 8-Hour Ozone National Ambient Air Quality Standards 8/26/2020 7/7/2021 86 FR 35608 Approving SIP submission for section 110(a)(2)(C), prong 3 of 110(a)(2)(D)(i), and 110(a)(2)(J) as it relates to the regulation of GHG emissions.
110(a)(1) and (2) Infrastructure Requirements for the 2015 8-Hour Ozone NAAQS 9/18/2018 12/2/2021 86 FR 68413 Addressing Prongs 1 and 2 of section 110(a)(2)(D)(i)(I) only.

[64 FR 32348, June 16, 1999]