Control strategy: Particulate matter.

Checkout our iOS App for a better way to browser and research.

§ 52.2429 Control strategy: Particulate matter.

(a) Determination of Attainment. EPA has determined, as of January 12, 2009, the Virginia portion of the Metropolitan Washington, DC-MD-VA nonattainment area for the 1997 PM2.5 NAAQS has attained the 1997 PM2.5 NAAQS. This determination, in accordance with 40 CFR 52.1004(c), suspends the requirements for this area to submit an attainment demonstration and associated reasonably available control measures, a reasonable further progress plan, contingency measures, and other planning SIPs related to attainment of the standard for as long as the area continues to attain the 1997 PM2.5 NAAQS.

(b) Maintenance Plan and Transportation Conformity Budgets. EPA approves the maintenance plan for the Virginia portion of the Washington, DC-MD-VA nonattainment area for the 1997 annual PM2.5 NAAQS submitted by the Commonwealth of Virginia for the entire Area on June 6, 2013 and supplemented on July 17, 2013. The maintenance plan includes motor vehicle emission budgets (MVEBs) to be applied to all future transportation conformity determinations and analyses for the entire Washington, DC-MD-VA PM2.5 Area for the 1997 PM2.5 NAAQS. The MVEBs are based on a tiered approach: Tier 1 MVEBs are effective as EPA has determined them adequate for transportation conformity purposes; Tier 2 mobile budgets will become effective upon the completion of the interagency consultation process and fully documented within the first conformity analysis that uses the Tier 2 MVEBs.

Expand Table

Washington, DC-MD-VA PM2.5 Area's Tier 1 Motor Vehicle Emissions Budgets for the 1997 Annual PM2.5 NAAQS, (tpy)

Type of control strategy SIP Year NOX PM2.5 Effective date of SIP approval
Maintenance Plan 2017 41,709 1,787 11/5/14
2025 27,400 1,350
Expand Table

Washington, DC-MD-VA PM2.5 Area's Tier 2 Motor Vehicle Emissions Budgets for the 1997 Annual PM2.5 NAAQS, (tpy)

Type of control strategy SIP Year NOX PM2.5 Effective date of SIP approval
Maintenance Plan 2017 50,051 2,144 Contingent and effective upon interagency consultation.
2025 32,880 1,586

[74 FR 1148, Jan. 12, 2009, as amended at 79 FR 60085, Nov. 5, 2014 ]


Download our app to see the most-to-date content.