Compliance schedules.

Checkout our iOS App for a better way to browser and research.

§ 52.1335 Compliance schedules.

(a) The compliance schedule for the source identified below is approved as a revision to the plan pursuant to § 51.104 and subpart N of this chapter. All regulations cited are air pollution control regulations of the State, unless otherwise noted.

Expand Table

Missouri

Source Location Regulation involved Adopted date Effective date Final compliance date
Pilot Knob Pelleting Co Pilot Knob, MO V(10 CSR 10-3.050) Oct. 19, 1977 Immediately Dec. 31, 1982.
Union Electric Labadie power plant Labadie, MO 10 CSR 10-5.090 and 10 CSR 10-5.030 June 20, 1979 July 20, 1979 Mar. 1, 1984.
St. Joe Minerals Corp., Pea Ridge Iron Ore Facility Washington County, MO 10 CSR 10-3,050 Mar. 23, 1983 Mar. 23, 1983 Dec. 31, 1988.
St. Joe Minerals Corp., Pea Ridge Iron Ore Facility ......do ......do Apr. 22, 1981 Dec. 28, 1981 July 1, 1985.
Associated Electric Cooperative, Inc., Thomas Hill Power Plant - Unit 1 Randolph County, MO 10 CSR 10-3.060 and 10 CSR 10-3.080 June 17, 1981 Jan. 12, 1982 June 1, 1984.
American Oil Co. (AMOCO) Sugar Creek, MO 10 CSR 10-2.260 Feb. 18, 1981 Oct. 1, 1981 June 1, 1982.
St. Joe Lead Co Herculaneum, MO § 203.050.1(5) RSM01978 Aug. 15, 1980 Immediately Oct. 27, 1984.
AMAX Lead Co Boss, MO ......do ......do ......do Apr. 27, 1985.

(b) The compliance schedule submitted for the source identified below is disapproved as not meeting the requirements of subpart N of this chapter. All regulations cited are air pollution control regulations of the State, unless otherwise noted.

Expand Table
Source Location Regulation involved Date adopted
Columbia Water & Light Department Columbia S-VI Apr. 25, 1973.
Union Electric: Electric generating facility Labadie X Mar. 28, 1974.
Do Portage des Sioux X July 25, 1974.
International Multifoods Corp.: Mechanical sifters North Kansas City (1) Aug. 31, 1976.
Meremac Mining Co., furnace and cooler Nos. 1 through 5 Pea Ridge II (10 CSR 10-3.050) Feb. 23, 1977.
Empire District Electric Co., Power Plant Asbury Joplin III (10 CSR 10-3.060) V (10 CSR 10-3.080) Apr. 27, 1977.
Missouri Portland Cement Co., clinker cooler No. 1 Sugar Creek II (10 CSR 10-2.030) V (10 CSR 10-2.060) June 22, 1977.
Missouri Public Service Co., Sibley powerplant, unit Nos. 1, 2, and 3 Sibley III (10 CSR 10-2.040) June 26, 1977.
Tamko Asphalt Products, Inc., asphalt saturating line Joplin V (10 CSR 10-3.080) July 26, 1977.
University of Missouri power plant Columbia 10 CSR 10-3.060 Feb. 21, 1979.
Noranda Aluminum, Inc New Madrid 10 CSR 10-3.050 Feb. 23, 1977.
Associated Electric Cooperative, Inc., Units 1 and 2 ......do 110 CSR 10-3.060 Apr. 18, 1979.

[39 FR 30835, Aug. 26, 1974]


Download our app to see the most-to-date content.