Applications for certification under this part shall be submitted in such manner as the Administrator may prescribe, shall be signed by the applicant or agent thereof, and shall include the following information:
(a) Name, address, and Internal Revenue Service identifying number of the applicant;
(b) Type and narrative description of the new identifiable facility for which certification is (or will be) sought, including a copy of schematic or engineering drawings, and a description of the function and operation of such facility;
(c) Address (or proposed address) of facility location;
(d) A general description of the operation in connection with which the facility is (or will be) used and a description of the specific process or processes resulting in discharges or emissions which are (or will be) controlled or prevented by the facility.
(e) If the facility is (or will be) used in connection with more than one plant or other property, one or more of which were not in operation before January 1, 1976, a description of the operations of the facility in respect to each plant or other property, including a reasonable allocation of the costs of the facility among the plants being serviced, and a description of the reasoning and accounting method or methods used to arrive at these allocations.
(f) A description of the effect of the facility in terms of type and quantity of pollutants, contaminants, wastes, or heat, removed, altered, stored, disposed of, or prevented by the facility.
(g) If the facility performs a function other than removal, alteration, storage, prevention, or disposal of pollutants, contaminants, wastes, or heat, a description of all functions performed by the facility, including a reasonable identification of the costs of the facility allocable to removal, alteration, storage, prevention, or disposal of pollutants, contaminants, wastes, or heat and a description of the reasoning and accounting method or methods used to arrive at the allocation.
(h) Date when such construction, reconstruction, or erection will be completed or when such facility was (or will be) acquired;
(i) Date when such facility is placed (or is intended to be placed) in operation;
(j) Identification of the applicable State and local water or air pollution control requirements and standards, if any;
(k) Expected useful life of facility;
(l) Cost of construction, acquisition, installation, operation, and maintenance of the facility;
(m) Estimated profits reasonably expected to be derived through the recovery of wastes or otherwise in the operation of the facility over the period referred to in paragraph (a)(6) of 26 CFR 1.169-2;
(n) The percentage (if any, and if the taxpayer claims that the percentage is 5 percent or less) by which the facility
(1) increases the output or capacity,
(2) extends the useful life, or
(3) reduces the total operating costs of the operating unit of the plant or other property most directly associated with the pollution control facility and a description of the reasoning and accounting method or methods used to arrive at this percentage.
(o) Such other information as the Administrator deems necessary for certification.
[36 FR 22382, Nov. 25, 1971, as amended at 43 FR 1340, Jan. 9, 1978]