St. Marys River.

Checkout our iOS App for a better way to browser and research.

§ 117.329 St. Marys River.

The draws of US17 bridge, mile 23.0, and the Seaboard System Railroad bridge, mile 23.1, both at Kingsland, shall open on signal if at least 48 hours notice is given.


Download our app to see the most-to-date content.