Except during testing -
(a) Electric detonators shall be kept shunted until connected to the blasting line or wired into a blasting round;
(b) Wired rounds shall be kept shunted until connected to the blasting line; and
(c) Blasting lines shall be kept shunted until immediately before blasting.