§ 550.1167 What information must I submit with forms and for approvals?

You must submit the supporting information listed in the following table with the form identified in column 1 and for the approval required under this subpart identified in column 2:

Expand Table
SRI BOEM-0127
(2 copies)
Reservoir reclassification
(a) Maps:
(1) Base map with surface, bottomhole, and completion locations with respect to the unit or lease line and the orientation of representative seismic lines or cross-sections
(2) Structure maps with penetration point and subsea depth for each well penetrating the reservoirs, highlighting subject wells; reservoir boundaries; and original and current fluid levels
(3) Net sand isopach with total net sand penetrated for each well, identified at the penetration point *
(4) Net hydrocarbon isopach with net feet of pay for each well, identified at the penetration point *
(b) Seismic data:
(1) Representative seismic lines, including strike and dip lines that confirm the structure; indicate polarity
(2) Amplitude extraction of seismic horizon, if applicable
(c) Logs:
(1) Well log sections with tops and bottoms of the reservoir(s) and proposed or existing perforations
(2) Structural cross-sections showing the subject well and nearby wells
(d) Engineering data:
(1) Estimated recoverable reserves for each well completion in the reservoir; total recoverable reserves for each reservoir; method of calculation; reservoir parameters used in volumetric and decline curve analysis
(2) Well schematics showing current and proposed conditions
(3) The drive mechanism of each reservoir
(4) Pressure data, by date, and whether they are estimated or measured
(5) Production data and decline curve analysis indicative of the reservoir performance
(6) Reservoir simulation with the reservoir parameters used, history matches, and prediction runs (include proposed development scenario) *
(e) General information:
(1) Detailed economic analysis
(2) Reservoir name and whether or not it is competitive as defined under § 250.105
(3) Operator name, lessee name(s), block, lease number, royalty rate, and unit number (if applicable) of all relevant leases
(4) Geologic overview of project
(5) Explanation of why the proposed completion scenario will maximize ultimate recovery
(6) List of all wells in subject reservoirs that have ever produced or been used for injection

(f) Depending on the type of approval requested, you must submit the appropriate payment of the service fee(s) listed in § 550.125, according to the instructions in § 550.126.