PocketLaw
Home
Catalog
Law Online
Teams
Our Free Mobile App
Permanent Program Performance Standards - Surface Mining Activities
Law
CFR 30
Mineral Resources
Office of Surface Mining Reclamation and Enforcement, Department of the Interior
Permanent Program Performance Standards
Permanent Program Performance Standards - Surface Mining Activities
Checkout our iOS App for a better way to browser and research.
Section
816.1
Scope.
Section
816.2
Objectives.
Section
816.10
Information collection.
Section
816.11
Signs and markers.
Section
816.13
Casing and sealing of drilled holes: General requirements.
Section
816.14
Casing and sealing of drilled holes: Temporary.
Section
816.15
Casing and sealing of drilled holes: Permanent.
Section
816.22
Topsoil and subsoil.
Section
816.41
Hydrologic-balance protection.
Section
816.42
Hydrologic balance: Water quality standards and effluent limitations.
Section
816.43
Diversions.
Section
816.45
Hydrologic balance: Sediment control measures.
Section
816.46
Hydrologic balance: Siltation structures.
Section
816.47
Hydrologic balance: Discharge structures.
Section
816.49
Impoundments.
Section
816.56
Postmining rehabilitation of sedimentation ponds, diversions, impoundments, and treatment facilities.
Section
816.57
Hydrologic balance: Stream buffer zones.
Section
816.59
Coal recovery.
Section
816.61
Use of explosives: General requirements.
Section
816.62
Use of explosives: Preblasting survey.
Section
816.64
Use of explosives: Blasting schedule.
Section
816.66
Use of explosives: Blasting signs, warnings, and access control.
Section
816.67
Use of explosives: Control of adverse effects.
Section
816.68
Use of explosives: Records of blasting operations.
Section
816.71
Disposal of excess spoil: General requirements.
Section
816.72
Disposal of excess spoil: Valley fills/head-of-hollow fills.
Section
816.73
Disposal of excess spoil: Durable rock fills.
Section
816.74
Disposal of excess spoil: Preexisting benches.
Section
816.79
Protection of underground mining.
Section
816.81
Coal mine waste: General requirements.
Section
816.83
Coal mine waste: Refuse piles.
Section
816.84
Coal mine waste: Impounding structures.
Section
816.87
Coal mine waste: Burning and burned waste utilization.
Section
816.89
Disposal of noncoal mine wastes.
Section
816.95
Stabilization of surface areas.
Section
816.97
Protection of fish, wildlife, and related environmental values.
Section
816.99
Slides and other damage.
Section
816.100
Contemporaneous reclamation.
Section
816.101
Backfilling and grading: Time and distance requirements.
Section
816.102
Backfilling and grading: General requirements.
Section
816.104
Backfilling and grading: Thin overburden.
Section
816.105
Backfilling and grading: Thick overburden.
Section
816.106
Backfilling and grading: Previously mined areas.
Section
816.107
Backfilling and grading: Steep slopes.
Section
816.111
Revegetation: General requirements.
Section
816.113
Revegetation: Timing.
Section
816.114
Revegetation: Mulching and other soil stabilizing practices.
Section
816.116
Revegetation: Standards for success.
Section
816.131
Cessation of operations: Temporary.
Section
816.132
Cessation of operations: Permanent.
Section
816.133
Postmining land use.
Section
816.150
Roads: general.
Section
816.151
Primary roads.
Section
816.180
Utility installations.
Section
816.181
Support facilities.
Section
816.200
Interpretative rules related to general performance standards.