Movable span bridges.

Checkout our iOS App for a better way to browser and research.

§ 650.809 Movable span bridges.

A fixed bridge shall be selected wherever practicable. If there are social, economic, environmental or engineering reasons which favor the selection of a movable bridge, a cost benefit analysis to support the need for the movable bridge shall he prepared as a part of the preliminary plans.


Download our app to see the most-to-date content.