Extension of time.

Checkout our iOS App for a better way to browser and research.

§ 205.6 Extension of time.

When a document is required to be filed within a prescribed time, an extension of time to file may be granted by the office with which the document is required to be filed upon good cause shown.


Download our app to see the most-to-date content.