Applicants for construction permits, manufacturing licenses, operating licenses, import and export licenses, approvals of facility standard reference designs, re-qualification and replacement examinations for reactor operators, and special projects and holders of construction permits, licenses, and other approvals shall pay fees for the following categories of services:
Table 1 to § 170.21 - Schedule of Facility Fees
[See footnotes at end of table]
Facility categories and type of fees | Fees1 2 | |
---|---|---|
A. Nuclear Power Reactors: | ||
Application for Construction Permit | Full Cost. | |
Early Site Permit, Construction Permit, Combined License, Operating License | Full Cost. | |
Amendment, Renewal, Dismantling-Decommissioning and Termination, Other Approvals | Full Cost. | |
Inspections3 | Full Cost. | |
B. Standard Reference Design Review: ROW> | Preliminary Design Approvals, Final Design Approvals, Certification | Full Cost. |
Amendment, Renewal, Other Approvals | Full Cost. | |
C. Test Facility/Research Reactor/Critical Facility: | ||
Application for Construction Permit | Full Cost. | |
Construction Permit, Operating License | Full Cost. | |
Amendment, Renewal, Dismantling-Decommissioning and Termination, Other Approvals | Full Cost. | |
Inspections3 | Full Cost. | |
D. Manufacturing License: | ||
Application for Construction | Full Cost. | |
Preliminary Design Approval, Final Design Approval | Full Cost. | |
Amendment Renewal, Other Approvals | Full Cost. | |
Inspections3 | Full Cost. | |
E. [Reserved] | ||
F. [Reserved] | ||
G. Other Production or Utilization Facility: | ||
Application for Construction Permit | Full Cost. | |
Construction Permit, Operating License | Full Cost. | |
Amendment, Renewal, Other Approvals | Full Cost. | |
Inspections3 | Full Cost. | |
H. Production or Utilization Facility Permanently Closed Down: | ||
Inspections3 | Full Cost. | |
I. Part 55 Reviews: | ||
Requalification and Replacement Examinations for Reactors Operators | Full Cost. | |
J. Special Projects: | ||
Approvals and preapplication/licensing activities | Full Cost. | |
Inspections3 | Full Cost. | |
Contested hearings on licensing actions directly related to U.S. Government national security initiatives | Full Cost. | |
Touhy requests5 | Full Cost. | |
K. Import and export licenses: | ||
Licenses for the import and export only of production or utilization facilities or the export only of components for production or utilization facilities issued under 10 CFR part 110 | ||
1. Application for import or export of production or utilization facilities4 (including reactors and other facilities) and exports of components requiring Commission and Executive Branch review, for example, actions under 10 CFR 110.40(b) | ||
Application - new license, or amendment; or license exemption request | $20,200 | |
2. Application for export of reactor and other components requiring Executive Branch review, for example, those actions under 10 CFR 110.41(a) | ||
Application - new license, or amendment; or license exemption request | 10,100 | |
3. Application for export of components requiring the assistance of the Executive Branch to obtain foreign government assurances | ||
Application - new license, or amendment; or license exemption request | 7,200 | |
4. Application for export of facility components and equipment not requiring Commission or Executive Branch review, or obtaining foreign government assurances | ||
Application - new license, or amendment; or license exemption request | 4,900 | |
5. Minor amendment of any active export or import license, for example, to extend the expiration date, change domestic information, or make other revisions which do not involve any substantive changes to license terms or conditions or to the type of facility or component authorized for export and, therefore, do not require in-depth analysis or review or consultation with the Executive Branch, U.S. host state, or foreign government authorities | ||
Minor amendment to license | 4,300 |
[53 FR 52648, Dec. 29, 1988]